Mobile
Log In Sign Up
Home > english-chinese > "emergency water" in Chinese

Chinese translation for "emergency water"

supply
备用水
非常用水


Related Translations:
emergency squawking:  发出呼救信号
emergency mould:  备用锭模
emergency weir:  临时堰
emergency disconnection:  紧急情况下截断电力供应应急断开
emergency release:  紧急解锁紧急释放紧急脱扣应急投放
emergency distance:  中断起飞滑距距离
emergency pump:  紧急备用泵事故备用泵事故应急泵事故用泵危急排水泵应急备用泵应急泵
critical emergency:  紧急危险情况
emergency decree:  安规安全技术规程应急规定
Example Sentences:
1.Despatch of water tankers for emergency water supply
派遣水车供应紧急食水
2.Emergency water suspension enquiry water sewage
紧急停水谘询(用水及排污)
3.Specification - indicator plates for fire hydrants and emergency water supplies
消防栓与应急给水指示板规范
4.Emergency repair of burst water mains and attendance to emergency water supply incidents
负责抢修水管爆裂处理紧急供水等事故
5.Eco - environmental responses of the lower reaches of tarim river to the emergency water deliveries
塔里木河下游应急输水的水生态环境响应
6.Analysis and evaluation on geological condition of emergency water supply project : mid - route of south - to - north water transfer project
南水北调中线京石段应急供水工程地质条件分析与评价
7.To effectively prevent the environmental deterioration in the downstream of the tarim , emergency water supply scheme was applied during the comprehensive control on the tarim basin
摘要为有效缓解塔里木河(以下简称“塔河” )下游生态进一步恶化,在塔河流域综合治理期间实施向塔河下游生态应急输水任务。
8.Since atmospheric type vacuum breakers are subject to normal maintenance and replacement , they should be located where emergency water spillage will create no problem and where they can be accessible for inspection or servicing
由于大气型真空断路阀需要正常的维护和更换,因此这类装置应该安装在紧急水泄漏或溢出不会产生问题的地方,还要容易接近进行检查或维修。
9.The preliminary summary and analyses on the key geological problems of the structures and canals for the emergency water supply project of bejing - shijiazhuang section on the mid - route of south - to - north water transfer project are described herein , of which the problems are to be solved during the construction with a great attention
摘要对京石段应急供水工程的各类建筑物及渠道主要工程地质问题进行初步总结与分析,并在今后的施工中应予重视及重点处理与解决。
10.Based on the analysis of the temperature test result of the landing rectangle aqueduct of caohe river for the emergency water supply project of the beijing - shijiazhuang section on the middle route of the south - to - north water diversion project , the temperature developing feature of the early - age hydration heat of the thin - wall concrete is described , and then the main effecting factors of the hydration heat temperature on the landing rectangle aqueduct and the control measures concerned are put forward herein
摘要通过对南水北调中线京石段应急供水工程漕河渡槽段落地矩形渡槽温度测试结果的分析,阐述了薄壁混凝土早期水化热温度发展的特点,提出了影响落地矩形渡槽水化热温度的主要因素与控制措施。
Similar Words:
"emergency war route" Chinese translation, "emergency ward" Chinese translation, "emergency warning" Chinese translation, "emergency warning circuit" Chinese translation, "emergency warning lamp" Chinese translation, "emergency water supply" Chinese translation, "emergency water system" Chinese translation, "emergency water valve" Chinese translation, "emergency weight" Chinese translation, "emergency weir" Chinese translation